Brand
  • QuickLook Tools
  • Google Map
  • Text
  • UWI
  • Databases
  • VelComp
  • VelCube
  • Products
  • About
  • Sign In
Tuned bed velocity is ≈ ft/ms
Actual bed two way time thickness is ms
Trough to peak time is ms giving a ms difference at bed onset.
Tuned trough at top of bed is ft and the base is ft in error.
Estimated seismic peak trough thickness: ft miscalculated.